Utilities Availability, Applications, Bonds & Fees

NOTICE FOR DEVELOPERS

Pre-App Meetings will be scheduled on Thursdays and developers will need to have contacted the Engineering Department/Planning Department to set up the meeting. The schedule needs to be set at least 24 hours in advance. Please have the following information provided in advance:

  1. Address/Parcel number/exact location
  2. Use(s) or potential use if undecided
  3. Preliminary layout or access points minimum

GeoCivix Plans

All Planning, Engineering, Utilities, and the Building Inspection Plan Reviews will need to be digitally submitted on the GeoCivix Portal.

Information page for Development Fees

If you have any questions about your electronic submittal, please call 615.444.0825.


UTILITY AVAILABLILITY

Request for Water, Sewer and Gas Availability

The following items shall be included with a water and/or sewer availability request:

  • Project Name, type and preliminary plan (if possible)
  • Project location map with tax map, parcel number and existing zoning
  • The plan shall include existing water and sewer lines near the site
  • Anticipated sewage flows in Single Family Unit Equivalents SFUEs
  • Anticipated water meter size, for the intended use
  • Anticipated gas needs

For Utility Availability Requests, follow this link https://lebanon.geocivix.com/secure/ to submit your request.  Please note, your application category is “Utilities Department” and your application type is “Utility Availability Request”

For more information contact:

Utilities Engineer - Utilities Department

200 Carver Lane

Lebanon, TN 37087

Phone: 615-444-0825

Procedures for Public Sewer Main Extensions
Development Fee Calculator
Water Specifications
Sewer Specifications
Sewer Use Ordinance (Discharge & Treatment)
Utilities Application (Tap Form)

Resources

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow